Project Description
Location:
Louisville, KY
Type:
New Facility
Description:
This project consisted of a new 230,000+ sf stamping plant facility designed and built in 2 phases. Building included a 60’ clear steel truss/column moment frames that carried cantilevered reactions from 50 ton crane girders. The elevated slab and surrounding floor slabs were designed for a 2000 psf Live Load for die/coil storage.
*Designed and managed by Michael Childers while employed by Luckett & Farley of Louisville, KY
Project Details
- LocationLouisville, KY
- TypeNew Facility
- DescriptionThis project consisted of a new 230,000+ sf stamping plant facility designed and built in 2 phases. Building included a 60’ clear steel truss/column moment frames that carried cantilevered reactions from 50 ton crane girders. The elevated slab and surrounding floor slabs were designed for a 2000 psf Live Load for die/coil storage.