Project Description

Location:
Louisville, KY

Type:
New Facility

Description:
This project consisted of a new 230,000+ sf stamping plant facility designed and built in 2 phases. Building included a 60’ clear steel truss/column moment frames that carried cantilevered reactions from 50 ton crane girders. The elevated slab and surrounding floor slabs were designed for a 2000 psf Live Load for die/coil storage.

*Designed and managed by Michael Childers while employed by Luckett & Farley of Louisville, KY

Project Details

  • LocationLouisville, KY
  • TypeNew Facility
  • DescriptionThis project consisted of a new 230,000+ sf stamping plant facility designed and built in 2 phases. Building included a 60’ clear steel truss/column moment frames that carried cantilevered reactions from 50 ton crane girders. The elevated slab and surrounding floor slabs were designed for a 2000 psf Live Load for die/coil storage.